Project
LOGIN
Search for:
Superintendents
Chancellors
Head Masters
Facilities / Property Managers
Architects
Engineers
Contractors
Directors
Facilities / Property Managers
Architects
Engineers
Contactors
Procurement Managers
Project Managers
Facilities / Property Managers
Architects
Engineers
Contractors
Owners
Facilities / Property Managers
Architects
Engineers
Contractors
Owners
Facilities / Property Managers
Architects
Engineers
Contractors
General Managers
Facilities / Property Managers
Architects
Engineers
Contractors
Procurement Managers
Port Engineers
Ship's Crew
Architects
Engineers
Contractors
Owners
Project Managers
Facilities / Property Managers
Architects
Engineers
Contractors
Education
Healthcare
Government
Hotels & Apartments
Office Buildings
Industrial & Manufacturing
Navy & Marine
Other
Benchmark 750 & 1000
Benchmark 1.5 Low NOx Boiler
Benchmark 2.0 Low NOx Boiler
Benchmark 3.0 Low NOx Boiler
Esteem 399 Low NOx Wall Hung Boiler
Esteem Cascade System
Benchmark
Esteem Boilers
KC-1000 Boiler
Modulex Boilers
Water-Wizard B+II
A+ (Model #SW1A+)
B+ (Model #SW1B+)
E+ (Model #WW3E+)
Innovation 600
Innovation 800
Innovation 1060
Single Wall
Double Wall
Model #SWDW24
Model #SWDW45
Model #SWDW68
Model #WWDW24
Model #WWDW45
Model #WWDW68
Steam-to-Water
Water-to-Water
Helitherm Indirect Heaters
Innovation Direct Fired Water Heaters
KC-1000 Gas Fired Heater
SmartPlate Heaters
U-Tube Double Wall Heaters
Model #SS1B+
Model #SS3CE+
Model #WS3E+
C-More Unit Controller
E8 Controller
Electronic Controls System
AERCO / ProtoNode Gateways
BMS II Model 5R5-384
Boiler Valve Controller
Communications Gateway
Modulex Pump Kits
X100 Corrosion Inhibitor
X200 Noise Reducer
X400 System Restorer
X500 Inhibited Antifreeze
AERCO Buffer Tanks
AERCO DHW Storage Tanks
Belimo F6 HDU Butterfly Motorized Valve
AERClean Air Filtration System
Communications Equipment
Condensate Neutralizer Kit
Hydraulic Separator
Optional Controls
Pump Products
Sentinel Products
Steam Traps
Tank Products
Valve Products
Selection Wizard
Boilers
Water Heaters
Clean Steam Generators
Integrated Controls
Accessories
Case Studies
Document Index
AERCO HydroSkrub
Benchmark Maintenance Kits
KC1000 Maintenance Kits
Modulex Maintenance Kits
Direct Fired SST
SST Recertification
Modulex Boilers
End User
Maintenance
Technical Training
O&M Manuals
Equipment Start-up & Registration
AERCO Technologies
AERCO Green Initiative
Importance of Modulation
Turndown vs. Valve Position
Condensing Flue Gases
Seasonal Performance
Comparing Efficiency
Self-Descaling Coil
Subcooling Steam
Rep Locator
Home
Markets
Products
Service & Support
Technologies
How to Buy
Connect with us
Home
>
Products
>
Case Studies
>
Upgrade vs. Repair
Case Studies
Upgrade vs. Repair
Publish Date: 05/2004
Products and Technologies
Benchmark
Condensing
BMS & Modulation
Five Benchmark units work in tandem to heat Chelmsford High School.
"Because of the results that AERCO showed in their first year at Chelmsford High School, we've installed Benchmarks at three additional schools."
- Gary Persechetti, supervisor of Building & Grounds
"For more than 25 years, we relied upon two huge cast-iron boilers to get us through the harsh New England winters," said Gary Persechetti, supervisor of Building and Grounds for Chelmsford High School. "When they gave out, it would have cost more to repair them than to replace them. A contractor from one of our construction projects introduced us to AERCO, who demonstrated the benefits of a modulating and condensing boiler."
Persechetti was impressed by the demonstration and in 2000 ordered five gas-fired Benchmark units from AERCO to support the school. Not only did the 10.0 million BTU/hr. boiler plant occupy less space than just one of the cast iron boilers, AERCO’s condensing design made it possible to eliminate all secondary pumps and associated controls, wiring, piping and valves, which streamlined the school’s overall heating system.
By extracting latent energy from water vapors created during combustion, AERCO’s condensing design proved to be significantly more energy efficient than the conventional equipment. AERCO’s Boiler Management System (BMS) coordinates the operation of the five Benchmark units. It provides each unit with firing instructions that ensure the plant’s maximum efficiency as it deals with fluctuating loads throughout the day. The plant operates on the simple principle that it requires less energy for a group of modulating boilers, each firing at “part load” to heat a building, than a single boiler operating at “full fire” to carry the entire workload. The ability to operate the AERCO boilers at lower water temperatures allowed Chelmsford High School to implement an indoor/outdoor temperature reset schedule to further enhance the system’s efficiency.
The Bottom Line
$81,000 in Energy Savings
Energy costs at the high school have decreased significantly since the AERCO system was implemented. During the first year of operation, 2000–2001, Chelmsford reduced fuel consumption by 33% from the previous year.
"Our lower fuel consumption saved us $81,000," said Persechetti. "Because of the results that AERCO showed in their first year at Chelmsford High School, we’ve installed Benchmarks at three additional schools. They’re everything you want in a boiler – efficient and self-reliant."