Project
LOGIN
Search for:
Superintendents
Chancellors
Head Masters
Facilities / Property Managers
Architects
Engineers
Contractors
Directors
Facilities / Property Managers
Architects
Engineers
Contactors
Procurement Managers
Project Managers
Facilities / Property Managers
Architects
Engineers
Contractors
Owners
Facilities / Property Managers
Architects
Engineers
Contractors
Owners
Facilities / Property Managers
Architects
Engineers
Contractors
General Managers
Facilities / Property Managers
Architects
Engineers
Contractors
Procurement Managers
Port Engineers
Ship's Crew
Architects
Engineers
Contractors
Owners
Project Managers
Facilities / Property Managers
Architects
Engineers
Contractors
Education
Healthcare
Government
Hotels & Apartments
Office Buildings
Industrial & Manufacturing
Navy & Marine
Other
Benchmark 750 & 1000
Benchmark 1.5 Low NOx Boiler
Benchmark 2.0 Low NOx Boiler
Benchmark 3.0 Low NOx Boiler
Esteem 399 Low NOx Wall Hung Boiler
Esteem Cascade System
Benchmark
Esteem Boilers
KC-1000 Boiler
Modulex Boilers
Water-Wizard B+II
A+ (Model #SW1A+)
B+ (Model #SW1B+)
E+ (Model #WW3E+)
Innovation 600
Innovation 800
Innovation 1060
Single Wall
Double Wall
Model #SWDW24
Model #SWDW45
Model #SWDW68
Model #WWDW24
Model #WWDW45
Model #WWDW68
Steam-to-Water
Water-to-Water
Helitherm Indirect Heaters
Innovation Direct Fired Water Heaters
KC-1000 Gas Fired Heater
SmartPlate Heaters
U-Tube Double Wall Heaters
Model #SS1B+
Model #SS3CE+
Model #WS3E+
C-More Unit Controller
E8 Controller
Electronic Controls System
AERCO / ProtoNode Gateways
BMS II Model 5R5-384
Boiler Valve Controller
Communications Gateway
Modulex Pump Kits
X100 Corrosion Inhibitor
X200 Noise Reducer
X400 System Restorer
X500 Inhibited Antifreeze
AERCO Buffer Tanks
AERCO DHW Storage Tanks
Belimo F6 HDU Butterfly Motorized Valve
AERClean Air Filtration System
Communications Equipment
Condensate Neutralizer Kit
Hydraulic Separator
Optional Controls
Pump Products
Sentinel Products
Steam Traps
Tank Products
Valve Products
Selection Wizard
Boilers
Water Heaters
Clean Steam Generators
Integrated Controls
Accessories
Case Studies
Document Index
AERCO HydroSkrub
Benchmark Maintenance Kits
KC1000 Maintenance Kits
Modulex Maintenance Kits
Direct Fired SST
SST Recertification
Modulex Boilers
End User
Maintenance
Technical Training
O&M Manuals
Equipment Start-up & Registration
AERCO Technologies
AERCO Green Initiative
Importance of Modulation
Turndown vs. Valve Position
Condensing Flue Gases
Seasonal Performance
Comparing Efficiency
Self-Descaling Coil
Subcooling Steam
Rep Locator
Home
Markets
Products
Service & Support
Technologies
How to Buy
Connect with us
Home
>
Products
>
Case Studies
>
Louisiana Medical Center Uses a Mix of Equipment for Separate Water & Space Heating Requirements
Case Studies
Louisiana Medical Center Uses a Mix of Equipment for Separate Water & Space Heating Requirements
Publish Date: 06/2004
Products and Technologies
KC-1000
Benchmark
BMS & Modulation
"We have scheduled a new project to upgrade our AERCO units for dual fuel usage... the ability to switch to propane for emergency back-up is mission-critical to our facility."
- John English, director of Plant Operations
Providing heat and hot water to support the Glenwood Regional Medical Center in West Monroe, Louisiana, is a 24/7 operation. For more than 25 years, these essential services at the 366,973 sq. ft. medical facility were driven by four large steam boilers that fed shell-and-tube heat exchangers to support the facility’s hydronic heating loop. These boilers also powered a storage tank water heating system for its domestic water supply. This hulking, inefficient system was overhauled in 2002, and the job of these steam-fired heaters was transferred to 11 AERCO gas-fired units.
“The design of the old boilers was woefully inefficient,” said John English, director of Plant Operations at Glenwood Regional Medical Center. “We were first introduced to AERCO on a visit to the Willis Knighton Medical Facility. After touring that facility’s mechanical room and seeing its low energy cost figures, we realized the advantages inherent with modulating and condensing boilers. We then requested that our consulting engineer, T. Hardy Hays of T. Hardy Hays Consulting Engineers, design a project that capitalized on high-efficiency AERCO units for our facility.”
English installed two AERCO natural gas-fired KC1000 tankless water heaters in the summer of 2002, and three more later that year in November. Two of the 1.0 million BTU/hr. water heaters are now used for kitchen water supply, with two others used for domestic water supply. The remaining unit – utilized as a swing heater – is set for domestic service but can be switched over to the kitchen if backup is needed.
During the November installation, six Benchmark boilers, connected to an AERCO BMS (Boiler Management System), were installed to handle the facility’s space heating load. The BMS regulates operation of the 12.0 million BTU/hr. boiler plant, giving each of the six modulating units precise firing instructions so that maximum energy efficiency is maintained and operating hours are distributed evenly across all boilers.
AERCO units provide heat and hot water to 366,973 sq. ft. medical center.
The Bottom Line
$70,000 in Gas Savings
Expenses at the large medical center have been significantly reduced since AERCO assumed the facility’s total hot water and heating loads. During the last six months, Glenwood Regional Medical Center cut its natural gas consumption by more than 8,055,000 cu. ft. when compared to average consumption over the previous four years.
“With AERCO we realized more than $70,000 in gas cost savings,” English said. “The units basically run themselves. We have scheduled a new project to upgrade our AERCO units for dual fuel usage. While our move away from steam to natural gas was a money-saving decision, the ability to switch to propane for emergency backup is mission-critical to our facility. AERCO is the only high-efficiency boiler that can alternate fuel supplies by simply changing the position of an internal valve.”
CCF
4 Yr. Avg.
CCF
2003
CCF
Savings
CCF
Save
Cost/
CCF
Cost
Save
Jan
0.144788
0.103471
0.0413171
15162.2500
0.8125
$12,317
Feb
0.131503
0.102926
0.0285772
10487.0636
0.9594
$10,061
Mar
0.131436
0.08311
0.0483267
17734.6045
0.8736
$15,494
Apr
0.105677
0.073251
0.0324267
11899.7270
0.9098
$10,826
May
0.101978
0.06195
0.0400283
14689.3171
0.9166
$13,464
Jun
0.090983
0.06216
0.0288234
10577.4083
0.9066
$9,590
Total
80,550.3701
$71,752
Sq. Ft. = 366,973